The first Compaq Server under test load (June, 2002).
Cluster installation (July, 2002).
Inside the first node (March, 2003).
The LASC (March, 2003).
Three "bogatyrs" (March, 2003).
Cluster console (March, 2003).
Installation process of new 120GB HDD (March, 2003).
New front-end node from SuperMicro (December, 2003).
LASC in the new room (January, 2004).
LASC networks: Gigabit Ethernet (top), Fast Ethernet (middle), KVM switch (bottom) (January, 2004).
LASC from back side (January, 2004).
LASC upgrade with two new 1U SuperMicro servers (white) and a rack (August, 2005).
LASC upgrade with four new 1U SuperMicro servers (black) and the second rack (January, 2006).
LASC upgrade with five 1U SuperMicro Opteron-based servers (left and center), air-conditioning Hitachi
system (right) and two AlliedTelesyn Gigabit switches (bottom) (January, 2007).
LASC upgrade with three 1U SuperMicro Opteron-based servers (May, 2007).
LASC upgrade with six 2xQuadCoreCPU 1U SuperMicro Opteron-based servers (January, 2008).
LASC upgrade with one IBM BladeCenter E Type 8677 with 14 Blade Servers (January, 2010).
LASC upgrade with 15 2xSixCoreCPU 1U SuperMicro Servers (2012-2013).
LASC upgrade with 20 2xEightCoreCPU 1U Dell PowerEdge Servers (2015) and
a new file server.
LASC upgrade with six Dell EMC C6400 2U Servers and six Supermicro SYS-6029TP-HTR 2U Servers (2019).
LASC after upgrade (2020).
|
These pages are maintained by Alexei Kuzmin
([email protected]).